Introduction
Education
Healthcare
Residential
Commercial
Extensions/refurbishments
Industrial
Heritage
   Quex Park
   Tyland Barn
   Palace Street
   King's School Shop
Ecclesiastical
Leisure
Health & Safety
Quality
Testimonials
Contact Us
 
 
Current Projects
News in Brief
Site Map
Useful Links
 

Quex Park

This listed building was converted from an existing bell tower and stable blocks into office accommodation over two phases.

The works comprised the removal of stable partitions and feeding troughs on the ground floor together with the coach house flats on the first floor. The floors were completely re-structured in consideration of the change of use and included Conservation compliant joinery to match that consistent with the original bell tower and coach house period.

The existing Victorian clock, which still chimes every 15 minutes and is wound manually once a week, was carefully protected and maintained for the duration of the refurbishment and alteration works.

Bath stone copings were replaced to match existing ones in certain locations and areas of brickwork were re-pointed using the tuck pointing method.

Client: Quex Park Estates

Value: £212,000

 
Quex Park, Birchington
Quex Park, Birchington
Quex Park, Birchington
Quex Park, Birchington
Quex Park, Birchington
Quex Park, Birchington
Quex Park, Birchington
Quex Park, Birchington